Case studies
Real pours, with the grades and volumes
From a 2 am road closure to a subfloor poured through a window. Each one sets out what was needed, which mix was supplied and how much.
-
Failand, Brockley and Wrington · BS40
Road schemes for a national infrastructure company
100 m³+
- Concrete
- ST2, ST4 semi-dry; S3 ST4
- For
- Kerbs, traffic light sockets
“Great service and great product. Has reduced site wastage of concrete massively”
Read the case study -
Bristol Airport
Two mixes from one truck, airside
C35 + ST2
- Volume
- 1.6 m³ + 2 m³
- Delivery
- After security clearance
-
Winford
New MOT bay
2.96 m³
used against 3 m³ ordered, on the second of two C45 visits.
Read the case study -
Main road into Bristol
A 2 am pour in a road closure
35 min
- Concrete
- 3.5 m³ ST4 semi-dry
- On site
- Including washout
-
Burnham-on-Sea
A subfloor poured through a window
< 10 min
1.5 m³ of C20, placed without barrowing.
Read the case study -
Langford · BS40
Sunday road closure: kerbs in small batches
- Concrete
- 4 m³ ST2 semi-dry
- Delivery
- Sunday, out of hours
- Result
- No mini digger needed
From our pours
More of the trucks at work



Planning a similar pour?
Send the grade, volume and timing, and we’ll provide a quote.