Case study · Burnham-on-Sea
Subfloor, Burnham-on-Sea
1.5 m³ poured through a window in under 10 minutes
< 10 min
to pour 1.5 m³ through a window
- Location
- Burnham-on-Sea
- Application
- New subfloor in a property conversion
- Concrete
- C20
- Volume
- 1.5 m³
- Delivery
- Poured through a window
- 01
The job
A seaside property in Burnham-on-Sea was being converted into rental apartments and needed a new concrete subfloor.
- 02
What was needed
The builders wanted to pour through a window rather than barrow the concrete in, so the window was removed to fit the chute.
- 03
On the day
1.5 m³ of C20 was placed through the window in under 10 minutes, without barrowing. The contractor gave Palmix positive feedback afterwards.
Planning something similar?
Tell us the grade, volume and time window you’re working to. Related service: Domestic concrete