Case study · Winford
MOT bay, Winford
C45 over two visits, charged on the volume used
2.96 m³
used, against 3 m³ ordered
- Location
- Winford
- Application
- New MOT bay ramp and sub-base
- Concrete
- C45
- Volume
- 8.2 m³, then 2.96 m³
- Delivery
- Two visits
- 01
The job
C45 concrete for a new MOT bay, supplied over two visits.
- 02
First visit
Palmix supplied the concrete for the ramp sub-base. The job needed 8.2 m³, more than was originally ordered.
- 03
Second visit
The contractor ordered 3 m³. The delivery ticket showed 2.96 m³ used.
Planning something similar?
Tell us the grade, volume and time window you’re working to. Related service: Volumetric concrete