Domestic concrete
Concrete for your home project, mixed on your drive
Shed bases, patios, paths, driveways and foundations. Work out roughly how much you need, and we’ll mix that amount on site. If you need a little more or less on the day, you pay for what’s poured.
- No part-load or disposal charges
- Help choosing the right mix
- Weekday, evening and weekend deliveries
Calculate your concrete volume



What are you building?
Choose your project to get started
Typical grades from our strength guide. If your plans or building control name a mix, that’s the one to order.

Things to think about
- Check how close the truck can get to the drive
- Measure the depth in a few places and use the average
- If your plans name a mix, order that one

Things to think about
- The grade should come from your engineer, architect or building control
- Have trenches dug and ready for inspection if building control needs to see them
- A strip foundation is length × trench width × depth

Things to think about
- Set the formwork to the finished level before the pour
- Narrow side passage? A pump can carry the concrete through
- Need water to drain through? Ask about permeable concrete

Things to think about
- Dig, level and edge the base before the truck arrives
- Base behind the house? Tell us the route from the road
- Measure the depth in a few places and use the average

Things to think about
- For retaining or garden walls, use what your plans call for
- Count the holes and measure the diameter and depth
- Each post hole is calculated as a cylinder
On the day
What a home delivery looks like
There’s no need to order a fixed load and hope it’s right. The truck mixes as you pour.
- Before
Have the ground ready
Your base dug, formwork or trenches in place, and a clear route from the road.
- Arrival
The truck parks close by
As near to the pour as access allows. If it can’t reach, ask us about pumping.
- The pour
Mixed as you place it
Fresh concrete comes off the chute at the pace you can spread it.
- After
Pay for what’s poured
With no part-load or disposal charges.
Thinking of mixing it yourself?
2 m³ by hand can take around five hours
A full wheelbarrow holds about 0.03 m³, so a 2 m³ base is roughly 60 loads. Our truck mixes about 1 m³ every two minutes, and bulk-bag materials rarely match the exact amount needed.
Should I mix my own concrete?Know your volume? Get a free quote
Send us the postcode, the volume from the calculator and your preferred date. For a pour this week, call us.