Havyatt Road depot, Langford South Bristol, North Somerset, Sedgemoor and the Mendips

Case study · Main road into Bristol

Out of hours, Bristol

A 2 am pour during a road closure for a new traffic island

35 min

on site, including washout

Location
Main road into Bristol
Application
New traffic island
Concrete
ST4 semi-dry
Volume
3.5 m³
Delivery
Overnight, about 2 am, during a road closure
  1. 01

    The job

    A main road into Bristol was closed overnight in September so a new traffic island could be built while the road was prepared for surfacing.

  2. 02

    What was needed

    The night team needed 3.5 m³ of ST4 semi-dry concrete in the middle of the closure, at about 2 am.

  3. 03

    On the night

    The truck was on site for about 35 minutes, including washout.

Project photo To be added from this job
Project photo To be added from this job

Planning something similar?

Tell us the grade, volume and time window you’re working to. Related service: Night and weekend deliveries