Case study · Main road into Bristol
Out of hours, Bristol
A 2 am pour during a road closure for a new traffic island
35 min
on site, including washout
- Location
- Main road into Bristol
- Application
- New traffic island
- Concrete
- ST4 semi-dry
- Volume
- 3.5 m³
- Delivery
- Overnight, about 2 am, during a road closure
- 01
The job
A main road into Bristol was closed overnight in September so a new traffic island could be built while the road was prepared for surfacing.
- 02
What was needed
The night team needed 3.5 m³ of ST4 semi-dry concrete in the middle of the closure, at about 2 am.
- 03
On the night
The truck was on site for about 35 minutes, including washout.