Bristol Airport

Two mixes from one truck, after airside clearance

2 mixes

from one truck, airside

Location
Bristol Airport
Application
Groundworks on the airport site
Concrete
C35 at S2, then ST2 at S3
Volume
3.6 m³ (1.6 m³ + 2 m³)
Delivery
Airside, with security clearance
  1. 01

    The job

    Following an earlier job together at Wick St Lawrence, a groundworks contractor asked Palmix to supply concrete for a project on the airport site.

  2. 02

    What was needed

    Working airside meant going through airport security procedures before the truck could reach the pour. Clearance took about two hours.

  3. 03

    On the day

    The truck mixed 1.6 m³ of C35 at S2 slump, then switched to 2 m³ of ST2 at S3. Both mixes came from the same truck.

Project photo To be added from this job