Case study · Failand, Brockley and Wrington, BS40
Road schemes, Failand to Wrington
Over 100 m³ in different strengths and slumps for a national infrastructure company
100 m³+
supplied across the schemes so far
- Location
- Failand, Brockley and Wrington, BS40
- Application
- Kerbs and traffic light sockets
- Concrete
- ST2 and ST4 semi-dry; S3 slump ST4
- Volume
- 100 m³+
- Delivery
- Repeat visits, including Sunday road closures
- 01
The job
Palmix has supplied concrete to a series of road schemes across Failand, Brockley and Wrington for a national infrastructure company.
- 02
What was needed
Each part of the work called for a different strength or slump: ST2 and ST4 semi-dry concrete for kerbs, and an S3 slump ST4 mix for traffic light sockets.
- 03
On the job
More than 100 m³ has been supplied so far. On one occasion, 40 m³ was delivered over two days.
“Great service and great product. Has reduced site wastage of concrete massively”