Case study · Langford, BS40
Sunday road closure, Langford
Kerb concrete in small batches, so no mini digger was needed
4 m³
of ST2 semi-dry, offloaded in small batches
- Location
- Langford, BS40
- Application
- Kerb laying
- Concrete
- ST2 semi-dry
- Volume
- 4 m³
- Delivery
- Sunday, during a road closure
- 01
The job
A national infrastructure company was laying kerbs during a Sunday road closure in Langford.
- 02
What was needed
4 m³ of ST2 semi-dry concrete for the kerbs, delivered out of hours.
- 03
On the day
The concrete was offloaded in small batches where it was needed, so the team needed no mini digger and less manual handling.