Havyatt Road depot, Langford South Bristol, North Somerset, Sedgemoor and the Mendips

Case study · Langford, BS40

Sunday road closure, Langford

Kerb concrete in small batches, so no mini digger was needed

4 m³

of ST2 semi-dry, offloaded in small batches

Location
Langford, BS40
Application
Kerb laying
Concrete
ST2 semi-dry
Volume
4 m³
Delivery
Sunday, during a road closure
  1. 01

    The job

    A national infrastructure company was laying kerbs during a Sunday road closure in Langford.

  2. 02

    What was needed

    4 m³ of ST2 semi-dry concrete for the kerbs, delivered out of hours.

  3. 03

    On the day

    The concrete was offloaded in small batches where it was needed, so the team needed no mini digger and less manual handling.

Project photo To be added from this job
Project photo To be added from this job

Planning something similar?

Tell us the grade, volume and time window you’re working to. Related service: Night and weekend deliveries